Find Incident Reports

Select a type or category of incident report that you would like to find.
Select a to find incident reports from a specific detention facility, or from all facilities.
Set the start and end dates to find incident reports between.
Some incident reports have an 'Incident Detail Report' attached. You may filter the results to find only incidents with these attachments.

Results

126 incident reports from Construction Camp APOD between 3 Oct 2009 and 26 May 2011.

Permalink
  1. Occurred
  2. Type
  3. Location
  4. Summary
  5. Location Details
  6. Number
  1. Incident 1-6QRM4P

    Occurred On
    Type
    Disturbance - Minor
    Location
    Construction Camp APOD
    Incident Summary
    Three clients arguing and abusive towards each other drawing the attention of other clients at Construction Camp.
    Location Details
    Breezeway adjacent to property storage room at Construction Camp Apod Vagabond Road Christmas Island.
    In. Number
    1-6QRM4P see details
  2. Incident 1-6QV77B

    Occurred On
    Type
    Media - Unauthorised presence
    Location
    Construction Camp APOD
    Incident Summary
    2 x females from Chilout organisation taking photpraphs of construction camp.
    Location Details
    Cricket Club Car Park, close to Construction Camp perimeter fence. Christmas Island.
    In. Number
    1-6QV77B see details
  3. Incident 1-6QV7M3

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    Complaint s. 47F(1) not resolved in time frame.
    Location Details
    Consttruction Camp APOD, Christmas Island WA
    In. Number
    1-6QV7M3 see details
  4. Incident 1-6QWKQ4

    Occurred On
    Type
    Self Harm-Attpted Serious
    Location
    Construction Camp APOD
    Incident Summary
    Self harm attempted with a razor blade
    Location Details
    Construction Camp Room D06
    In. Number
    1-6QWKQ4 see details
  5. Incident 1-6S8S73

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    Complaint s. 47F(1) is not resolved in the time frame.
    Location Details
    Construction Camp APOD, Christmas Island WA
    In. Number
    1-6S8S73 see details
  6. Incident 1-6SBGIT

    Occurred On
    Type
    Abusive/Aggressive Behaviour
    Location
    Construction Camp APOD
    Incident Summary
    Client s. 47F(1) has informed Diac that her husband has been abusive towards her. Diac on call have been advised and more information to be advised. AFP have been offfered.
    Location Details
    Construction Camp APOD, Christmas Island WA
    In. Number
    1-6SBGIT see details
  7. Incident 1-6SBG39

    Occurred On
    Type
    Abusive/Aggressive Behaviour
    Location
    Construction Camp APOD
    Incident Summary
    Client s. 47F(1) informed Diac that her husband has been abusive towards her. Diac on call advised and more information to beadvised.
    Location Details
    Construction Camp APOD, Christmas Island WA
    In. Number
    1-6SBG39 see details
  8. Incident 1-6TGHWO

    Occurred On
    Type
    Assault - Serious
    Location
    Construction Camp APOD
    Incident Summary
    Father and Mother has allegedy hit their child.
    Location Details
    Constuction Camp I-Block corridor and in RmI23
    In. Number
    1-6TGHWO see details
  9. Incident 1-6TTD6H

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    Complaint s. 47F(1) not resolved within time frame.
    Location Details
    CC APOD Christmas Island WA
    In. Number
    1-6TTD6H see details
  10. Incident 1-6TTD6K

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    Complain s. 47F(1) not resolved within time frame.
    Location Details
    CC APOD Christmas Island WA
    In. Number
    1-6TTD6K see details
  11. Incident 1-6TXRUO

    Occurred On
    Type
    Self Harm - Threatened
    Location
    Construction Camp APOD
    Incident Summary
    client threatened to kill himself and his wife and children
    Location Details
    Construction camp room I13
    In. Number
    1-6TXRUO see details
  12. Incident 1-6TXS7Q

    Occurred On
    Type
    Self Harm - Threatened
    Location
    Construction Camp APOD
    Incident Summary
    Client s. 47F(1) placed on moderate PSP by mental health. Threatening self harm.
    Location Details
    Construction Camp medical Centre.
    In. Number
    1-6TXS7Q see details
  13. Incident 1-6TZQ5S

    Occurred On
    Type
    Self Harm - Threatened
    Location
    Construction Camp APOD
    Incident Summary
    A client has informed DIAC Officer's that he will self harm and harm others following information passed onto clients regarding transfers
    Location Details
    Construction Camp APOD
    In. Number
    1-6TZQ5S see details
  14. Incident 1-6UKAKN

    Occurred On
    Type
    Voluntary starvation (<24 hrs)
    Location
    Construction Camp APOD
    Incident Summary
    Client s. 47F(1) has stated that he is on a Hunger Strike.
    Location Details
    Construction Camp APOD christmas Island WA
    In. Number
    1-6UKAKN see details
  15. Incident 1-6UJZLJ

    Occurred On
    Type
    Voluntary starvation (<24 hrs)
    Location
    Construction Camp APOD
    Incident Summary
    Client s. 47F(1) has stated that she is on a hunger strike.
    Location Details
    Construction Camp APOD, Christmas Island WA
    In. Number
    1-6UJZLJ see details
  16. Incident 1-6UKX4H

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    Complaint s. 47F(1) not resolved within the time frame.
    Location Details
    Construction Camp APOD Christmas Island WA
    In. Number
    1-6UKX4H see details
  17. Incident 1-6UWTXP

    Occurred On
    Type
    Disturbance - Minor
    Location
    Construction Camp APOD
    Incident Summary
    Upset client very vocal to DIAC officer regarding lack of feedback for non transfer and property issues.
    Location Details
    Client telephone area Construction Camp Vagabond Road Christmas Island
    In. Number
    1-6UWTXP see details
  18. Incident 1-6UXW52

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    Complaint s. 47F(1) not resolved within time frame.
    Location Details
    Construction Camp APOD Christmas Island WA
    In. Number
    1-6UXW52 see details
  19. Incident 1-6UYXKB

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    Complaint s. 47F(1) not resolved within time frame
    Location Details
    Construction Camp APOD Christmas Island WA
    In. Number
    1-6UYXKB see details
  20. Incident 1-6VOGEF

    Occurred On
    Type
    Disturbance - Minor
    Location
    Construction Camp APOD
    Incident Summary
    Minorverbal altercation between 2 clients.
    Location Details
    Construction Camp 'Delta ' block
    In. Number
    1-6VOGEF see details
  21. Incident 1-6VWCT1

    Occurred On
    Type
    Assault - Minor
    Location
    Construction Camp APOD
    Incident Summary
    Clients suferred hot water burnts to chest, face and nekh area. Incident ID 1-6VOFQW level raised from Minorto Major.
    Location Details
    Construction Camp APOD Vagabond Road Christmas Island
    In. Number
    1-6VWCT1 see details
  22. Incident 1-6VOFQW

    Occurred On
    Type
    Disturbance - Minor
    Location
    Construction Camp APOD
    Incident Summary
    2 clients presented at Medical with boiling water burns.
    Location Details
    Construction Camp Medical Center/ Bravo block kitchen
    In. Number
    1-6VOFQW see details
  23. Incident 1-6X0VVN

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    Complain s. 47F(1) not resolved within the time frame.
    Location Details
    Construction Camp APOD Christmas Island WA
    In. Number
    1-6X0VVN see details
  24. Incident 1-6X0VWF

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    Complaint s. 47F(1) ot resolved within the time frame.
    Location Details
    Construction Camp APOD Christmas Island WA
    In. Number
    1-6X0VWF see details
  25. Incident 1-6X0VYB

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    Complaint s. 47F(1) not resolved within the timeframe.
    Location Details
    Construction Camp APOD Christmas Island WA
    In. Number
    1-6X0VYB see details
  26. Incident 1-6Y8TUH

    Occurred On
    Type
    Contamination/Infection
    Location
    Construction Camp APOD
    Incident Summary
    Majority of Clients from SIEV s. 47F(1) INM has Head Lice.
    Location Details
    Construction Camp
    In. Number
    1-6Y8TUH see details
  27. Incident 1-6Y9QA5

    Occurred On
    Type
    Assault - Minor
    Location
    Construction Camp APOD
    Incident Summary
    Clien s. 47F(1) nformed that his father and his mother beat him and would like to be seperated from his family.
    Location Details
    Construction Camp APOD - I-Block
    In. Number
    1-6Y9QA5 see details
  28. Incident 1-6YXP7O

    Occurred On
    Type
    Abusive/Aggressive Behaviour
    Location
    Construction Camp APOD
    Incident Summary
    Client s. 47F(1) angry at IHMS Medical for not attending him.
    Location Details
    Construction Camp APOD- CC Medical Entrance.
    In. Number
    1-6YXP7O see details
  29. Incident 1-6Z0F4H

    Occurred On
    Type
    Disturbance - Minor
    Location
    Construction Camp APOD
    Incident Summary
    clients had Minorverbal altercation
    Location Details
    Construction Camp Basketball Courts
    In. Number
    1-6Z0F4H see details
  30. Incident 1-6ZCVN2

    Occurred On
    Type
    Media - Unauthorised presence
    Location
    Construction Camp APOD
    Incident Summary
    journalist/photographer taking photos attempting to talk to clients, over perimeter fence.
    Location Details
    Far end (Cricket club end) of alpha block , construction camp. Christmas Island.
    In. Number
    1-6ZCVN2 see details
  31. Incident 1-702029

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    complaint not resolved within timeframes
    Location Details
    Construction Camp APOD
    In. Number
    1-702029 see details
  32. Incident 1-70205T

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    complaint not resolved within timeframes
    Location Details
    Construction Camp APOD
    In. Number
    1-70205T see details
  33. Incident 1-70RVTA

    Occurred On
    Type
    Emergency - medical - offsite
    Location
    Construction Camp APOD
    Incident Summary
    Female Client fainted in Dining Room Client taken to hospital at 1830
    Location Details
    Dining Room Construction Camp
    In. Number
    1-70RVTA see details
  34. Incident 1-71AXKU

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    complaint s. 47F(1) not resolved with in 3 days
    Location Details
    Construction Camp APOD
    In. Number
    1-71AXKU see details
  35. Incident 1-711THQ

    Occurred On
    Type
    Contamination/Infection
    Location
    Construction Camp APOD
    Incident Summary
    Centre Manager notified by IHMS that client s. 47F(1) who fainted in the mess on 5/5/2011 and was admitted to local hospital has dengi fever
    Location Details
    Construction Camp APOD K block
    In. Number
    1-711THQ see details
  36. Incident 1-71AXUG

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    complaint s. 47F(1) not resolved with in 3 days
    Location Details
    Construction Camp APOD
    In. Number
    1-71AXUG see details
  37. Incident 1-71AXE4

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    complaint s. 47F(1) not resolved with in 3 days
    Location Details
    Construction Camp APOD
    In. Number
    1-71AXE4 see details
  38. Incident 1-71AXKX

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    complaint s. 47F(1) not resolved with in 3 days
    Location Details
    Construction Camp APOD
    In. Number
    1-71AXKX see details
  39. Incident 1-71AXUO

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    complaint s. 47F(1) not resolved with in 3 days
    Location Details
    Phosphate Hill APOD
    In. Number
    1-71AXUO see details
  40. Incident 1-71BRRU

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    complaint s. 47F(1) not resolved with in 3 days
    Location Details
    Construction Camp APOD
    In. Number
    1-71BRRU see details
  41. Incident 1-71MWB5

    Occurred On
    Type
    Abusive/Aggressive Behaviour
    Location
    Construction Camp APOD
    Incident Summary
    Client made Threat to Kill statement towards staff
    Location Details
    Construction Camp Control
    In. Number
    1-71MWB5 see details
  42. Incident 1-73MEFS

    Occurred On
    Type
    Escape
    Location
    Construction Camp APOD
    Incident Summary
    This incident has been created after reviewing s. 47F(1) to reflect that 2 of the clients were from construction Camp
    Location Details
    Construction Camp APOD
    In. Number
    1-73MEFS see details
  43. Incident 1-733XV3

    Occurred On
    Type
    Assault - Not OBH
    Location
    Construction Camp APOD
    Incident Summary
    client b s. 47F(1) night and CSO Cook
    Location Details
    A block at construction camp
    In. Number
    1-733XV3 see details
  44. Incident 1-733Y5J

    Occurred On
    Type
    Voluntary starvation (<24 hrs)
    Location
    Construction Camp APOD
    Incident Summary
    clien s. 47F(1) ho was a participant in an escape sitting in her room refusing food or w3ater
    Location Details
    Construction Camp APOD room J12
    In. Number
    1-733Y5J see details
  45. Incident 1-73L768

    Occurred On
    Type
    Voluntary starvation (>24 hrs)
    Location
    Construction Camp APOD
    Incident Summary
    s. 47F(1) is continuing her Voluntary starvation.
    Location Details
    This report has been written by CSM S Dodkin at 09:30AM on the 11/05/20011, Christmas Island time. At 09:00 AM, Client s. 47F(1) is continuing her Voluntary starvation. This incident is linked to the previous incident 1-733Y5J. Client resides in room J16 and is currently on PSP Constant.
    In. Number
    1-73L768 see details
  46. Incident 1-73L6WU

    Occurred On
    Type
    Media - Incident of interest
    Location
    Construction Camp APOD
    Incident Summary
    Media presenter on site with a member of the public
    Location Details
    Construction Camp APOD carpark
    In. Number
    1-73L6WU see details
  47. Incident 1-73ME88

    Occurred On
    Type
    Media - Incident of interest
    Location
    Construction Camp APOD
    Incident Summary
    Local photo journalist at recreation centre taking photographs
    Location Details
    CI Recreation area carpark
    In. Number
    1-73ME88 see details
  48. Incident 1-74MJID

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    COMPLAINT NO s. 47F(1) UNRESOLVED WITHIN TIME FRAME
    Location Details
    CONSTRUCTION CAMP
    In. Number
    1-74MJID see details
  49. Incident 1-74MJIJ

    Occurred On
    Type
    Complaint Unresolved in time
    Location
    Construction Camp APOD
    Incident Summary
    COMPLAINT NO s. 47F(1) 8UNRESOLVED WITHIN TIME FRAME
    Location Details
    CONSTRUCTION CAMP
    In. Number
    1-74MJIJ see details
  50. Incident 1-748FG4

    Occurred On
    Type
    Media - Unauthorised presence
    Location
    Construction Camp APOD
    Incident Summary
    Media (60 minutes team) attempted to gain access to Construction camp. Filmed site.
    Location Details
    main Entrance Construction Camp, Christmas Island.
    In. Number
    1-748FG4 see details